Data Center Design/Build (via Instant Mobilizer)
Description
pulled from site's meta descriptionLevel 8 Group (L8G) specialize in Data Center Design, Construction, Consulting, Consolidation Planning, Development Services, Commissioning and Relocation of Mission Critical Facilities, L8G and its team have been designing and building mission criti
Domain Resolution
This domain resolves to the following IP addresses:This is an automatically generated AboutUs page for level8group.mobi. Click the "Edit" button at the top of the page to make changes. Please read our Getting Started page if you need any help.
Categories:
- AboutUs AutoGen
- PUE
- P.U.E.
- Datacenter
- data center facilities
- building a data center
- data center construction
- green data centers
- Tier 3 data center
- Tier 4 data center
- data center design guide
- Data Center facility
- data center power
- data center world
- data center design
- data center management
- data center conference
- data center knowledge
- green data center
- data center solution
- data center solutions
- data center companies
- data center best practice
- data center consulting
- IT Project Management
- 24/7
- 24/7/365
- 48 volt DC UPS system
- 7 by 24 exchange
- AFCOM
- Air conditioning ductwork
- Air cooled chillers
- Air flow modeling
- CFD
- Computational Fluid
- Dynamics
- Architectural
- ASHRAE
- ATS
- Audio Visual System
- Automatic transfer switch
- Availability
- Backup generators
- Build data center
- Build
- Building Automation and Control System
- Build-to-suit data center
- Cable tray system
- Call centers
- Capacity
- Redundancy
- CDCDP
- Checklist of equipment
- Chilled water piping
- Chilled water system
- Chilled water
- Cold Aisle
- Cold Aisle/Hot Aisle Colo facilit